MB & FILS was awarded the contract by the Port Authority of Douala to carry out a critical dredging operation at the fishing dock of the Port of Douala–Bonabéri. The objective was to restore proper depth and improve vessel access through the quay and entrance channel, ensuring the smooth and safe movement of fishing boats and support vessels.
🎯 Objectives
Remove sediment buildup restricting vessel access
Restore navigational depth at the quay and entrance channel
Improve the operational safety and capacity of the fishing dock
Support sustainable fishing and marine operations within the port
⚙️ Scope of Work
Pre-dredging bathymetric survey and sediment profiling
Mechanical dredging of the access quay and entrance passage
Collection, transport, and disposal of dredged material at approved sites
Continuous environmental monitoring and compliance reporting
On-site coordination with port authorities and local stakeholders
🌱 Environmental & Safety Measures
As part of our commitment to safe and responsible operations, MB & FILS implemented:
Sediment containment barriers and water quality monitoring
Use of low-noise, fuel-efficient dredging equipment
Strict adherence to maritime and environmental regulations
Daily safety briefings and site inspections to protect workers and the environment
✅ Results Delivered
Achieved targeted depth to accommodate fishing vessels of various sizes
Improved turnaround time and reduced congestion at the fishing dock
Enhanced safety for vessel docking and maneuvering
Project delivered within the 3-month timeline with zero incidents
Positive client feedback and operational improvements noted by the Port Authority of Douala
📩 Conclusion
This successful 3-month dredging project at the Port of Douala–Bonabéri demonstrates MB & FILS’ technical capacity and commitment to excellence in marine infrastructure. Our collaboration with the Port Authority of Douala highlights our growing impact on coastal development and maritime operations in Cameroon and beyond.