🛠️EXECUTION OF DREDGING WORKS ON THE ACCESS QUAY AND THE ENTRANCE PASSAGE OF THE FISHING DOCK AT THE PORT OF DOUALA BONABERI

📍 Location: Port of Douala–Bonabéri, Cameroon

🗓 Duration: 3 Months

🧰 Client: Port Authority of Douala

👷 Contractor: MB & FILS


📌 Project Overview

MB & FILS was awarded the contract by the Port Authority of Douala to carry out a critical dredging operation at the fishing dock of the Port of Douala–Bonabéri. The objective was to restore proper depth and improve vessel access through the quay and entrance channel, ensuring the smooth and safe movement of fishing boats and support vessels.


🎯 Objectives

  • Remove sediment buildup restricting vessel access
  • Restore navigational depth at the quay and entrance channel
  • Improve the operational safety and capacity of the fishing dock
  • Support sustainable fishing and marine operations within the port

⚙️ Scope of Work

  • Pre-dredging bathymetric survey and sediment profiling
  • Mechanical dredging of the access quay and entrance passage
  • Collection, transport, and disposal of dredged material at approved sites
  • Continuous environmental monitoring and compliance reporting
  • On-site coordination with port authorities and local stakeholders

🌱 Environmental & Safety Measures

As part of our commitment to safe and responsible operations, MB & FILS implemented:

  • Sediment containment barriers and water quality monitoring
  • Use of low-noise, fuel-efficient dredging equipment
  • Strict adherence to maritime and environmental regulations
  • Daily safety briefings and site inspections to protect workers and the environment

Results Delivered

  • Achieved targeted depth to accommodate fishing vessels of various sizes
  • Improved turnaround time and reduced congestion at the fishing dock
  • Enhanced safety for vessel docking and maneuvering
  • Project delivered within the 3-month timeline with zero incidents
  • Positive client feedback and operational improvements noted by the Port Authority of Douala

📩 Conclusion

This successful 3-month dredging project at the Port of Douala–Bonabéri demonstrates MB & FILS’ technical capacity and commitment to excellence in marine infrastructure. Our collaboration with the Port Authority of Douala highlights our growing impact on coastal development and maritime operations in Cameroon and beyond.

Leave a Reply

Your email address will not be published. Required fields are marked *